News & projects

Quick release hooks with wireless remote control and solar system

Succesfull delivery of 4 sets of 100T quick release mooring hooks to be used on mooring buoys. The quick release mooring hooks are equipped with a remote controlled release system. Power supply is generated by Straatman’s solar system.

Client: Ghana Petroleum Mooring Systems

Read more

Straatman Dredging Equipment – 8 pcs. bow couplings ø762

Succesfull production, completion and delivery of 8 pcs. of ø762 bow couplings for GLDD.

Client: GLDD

Read more

Customized ø750 mm. bow coupling installation

A customized bow coupling installation ø750 mm. is designed, engineered and produced in our facilities in Zwijndrecht, The Netherlands. This bow coupling is executed with an  integrated rainbow nozzle system. This system is automatically operated by hydraulic power enabling the client to use Straatman’s bow coupling installation for both rainbowing as well as connection to the floating pipeline.

Client: Van der Kamp International Dredging

Read more

Quick Release Pinch Ball Joint ø1000 (37/45 Bar)

Invented, designed and produced in our production facilities in Zwijndrecht – The Netherlands. With passion, dedication and more over EXPERTISE we have successfully delivered this ø1000 (37/45 Bar) quick release pinch ball joint. This ball joint is used on one of the biggest cutter suction dredgers on the world, and will realize a safe and quick connection between the dredger and the floating pipeline. Main application of this part is the quick release function.

Read more

4x non-return dredging valves ø508

Client: Ellicot Dredges

Read more

Quick Release Mooring Hooks for Buoys

Delivery of 6 sets of double 100T quick release mooring hook units, executed with remote controlled release system. Straatman’s quick release mooring hooks are us on several mooring buoy applications.

Read more

8x QRMH 100-4 with MLMS, automatic release and Berthing Aid System

Recently we completed a mooring hook project with a successful factory acceptance test as result. This project contained 8 sets of quadruple quick release mooring hooks of 100T. All hook units were ordered with full options, including automatic release, integrated mooring load monitoring system, explosion proof certified and integrated capstans.

Read more

Stay updated about our product innovations!

Receive our quarterly newsletter now.